KDOT is constructing a Restricted Crossing U-Turn (RCUT) at the intersection of U.S. 73 (K-7) and Parallel Parkway in Wyandotte County. The RCUT design will restrict left turns and through movements at the minor road, Parallel Parkway, to improve safety and intersection operations. The redesigned intersection will direct traffic from Parallel Parkway to turn right onto the highway and then make a U-turn at a designated median opening.
Project construction began in September 2022, paused for the winter shutdown period, and is scheduled to resume in March 2023 with anticipated completion in January 2024.
Project Name | U.S. 73 (K-7) and Parallel Parkway Restricted Crossing U-Turn (RCUT) in Wyandotte County |
Project Number | KA-5241-01 |
Location | U.S. 73 (K-7) and Parallel Parkway |
Description | Construct a signalized Restricted (reduced conflict) Crossing intersection at U.S. 73 (K-7) and Parallel Parkway. Improve vertical alignment to improve sight distance. |
Length | NA |
Cost Estimate | $12 million |
Project Timeline | Project construction began in September 2022, paused for the winter shutdown period, and is scheduled to resume in March 2023 with anticipated completion in January 2024. |
Materials below were shared at the open house on Feb. 23.
Meeting information can be made available in alternative accessible formats upon request. Contact the KDOT Division of Communications at least one week before the meeting by phone 785-296-3585 (Voice) / 7-1-1 (Hearing Impaired).
Delaney Tholen
KC Metro Public Affairs Manager
785-817-9365